Thursday was a banner day for Bob Chamberland and crew at Dawson Lake. The last of over 3000 loads of material was put in place and the dam was completed.
These pictures show the last load of material being laid down and compacted and also the standpipe and finished dam from different view points.
Congratulations Bob on an outstanding job!
- Richard Grist