A beautiful spring morning at Dawson Lake with lots of projects in progress. The wetland construction is just about complete with the Hydroseeding of the wetlands grass mixture being done last Friday. The the tree planting in the new wetlands area got underway today with the crew planting bare root stock redbud, silver and red maple, sycamore, black willow, pin oak and river birch.

- Richard Grist





{above} Bob Chamberland standing near what will be the bottom of the lake at the base of the dam. The orange survey stakes delineate the key-way for the dam.
{above & below} The Terradon survey crew out shooting control points to maintain accuracy of the site plan.